New Location Opening process diagram
This is a worked example. Wavelength built the diagram below from the description on this page. Nobody drew it by hand.
What was said
The franchisee signs the franchise agreement. The franchisor reviews and approves the site. If the site is not approved, the franchisee finds a new site. If the site is approved, the buildout begins. The franchisee completes training. An inspection checks the location. If the inspection fails, the franchisee fixes the issues. If it passes, the soft open runs for a week. Then the grand opening happens.
The diagram
What is in this flow
- Systems: None.
- People and teams: Franchisor, Franchisee.
- Decisions: Site Approved?, Inspection Passed?.
- Size: 13 steps and 13 connections.
Steps
- Sign Franchise Agreement
- Franchisor
- Review Site (Franchisor)
- Site Approved?
- Franchisee
- Find New Site (Franchisee)
- Start Buildout (Franchisee)
- Complete Training (Franchisee)
- Inspection (Franchisor)
- Inspection Passed?
- Fix Issues (Franchisee)
- Soft Open (Franchisee)
- Grand Opening
Mermaid code
Copy this into any Markdown file, GitHub README, or Mermaid Live to render the same flow.
flowchart TD
n1([Sign Franchise Agreement])
n2(Franchisor)
n3[Review Site]
n4{Site Approved?}
n5(Franchisee)
n6[Find New Site]
n7[Start Buildout]
n8[Complete Training]
n9[Inspection]
n10{Inspection Passed?}
n11[Fix Issues]
n12[Soft Open]
n13([Grand Opening])
n1 -->|signs| n2
n2 -->|reviews| n3
n3 -->|decides| n4
n4 -->|No| n6
n4 -->|Yes| n7
n6 -->|new site| n3
n7 -->|buildout done| n8
n8 -->|training done| n9
n9 -->|inspects| n10
n10 -->|No| n11
n10 -->|Yes| n12
n11 -->|fixed| n9
n12 -->|soft open done| n13
Map your own process
Describe your version out loud, or paste the transcript of a call. Wavelength draws the flow as you talk, and you can edit it by voice, by prompt, or by hand.
Every new account starts with 7 days of Pro. No card needed.
This example is part of our guide for franchise operations.